Blende Silver Corp. (TSX.V: BAG) (OTC: BAGGF) announced that the Yukon Department of Energy, Mines and Resources has granted a five-year Class 3 Quartz Mining Land Use Approval (Approval No. LQ00608) for its 100%-owned Blende Silver-Zinc-Lead Project in north-central Yukon. The approval, effective July 13, 2026, and valid through July 12, 2031, covers all 260 quartz claims and represents the final major permit required for the Company to execute its planned multi-year exploration programs.
The approval permits diamond drilling across the project area, an operating season from February 1 to September 15 annually, camp facilities for up to 50 persons supporting up to 11,300 person days of work, a permitted airstrip (25,000 m2), upgrading of 5 km of existing access and construction of 2 km of new road, winter access via the Wind River Winter Road (two round trips per year), and on-site fuel storage. This infrastructure is expected to improve the efficiency and cost profile of field operations.
Andrew H. Rees, President and CEO, stated: “This approval is a major de-risking milestone for Blende Silver. With a five-year Class 3 permit in hand covering the entire claim package, the Company now has the regulatory certainty to plan and execute sustained, multi-season drill programs at what is the largest carbonate-hosted silver-zinc-lead deposit in Yukon.” He added that the permitted airstrip and camp infrastructure, combined with district-scale targeting work with Ronacher McKenzie Geoscience, position Blende to advance aggressively toward resource growth.
The Company acknowledged the First Nation of Na-Cho Nyak Dun, on whose traditional territory the Blende Project is located, and committed to responsible exploration, progressive reclamation, and full compliance with all conditions of the approval, including wildlife, heritage, and environmental protection measures.
The Blende Project hosts the largest carbonate-hosted silver-zinc-lead deposit in the Yukon, according to M. Robinson and C.I. Godwin (Economic Geology 1995). A mineral resource estimate prepared in accordance with National Instrument 43-101 at a 1.5% ZnEq cutoff, disclosed in the Company’s news release dated May 20, 2021, is based on metal prices of silver at US$26 per ounce, zinc at US$1.30 per pound, and lead at US$1.00 per pound. The estimate has not been updated to reflect current prices. Historical exploration defined the East and West Zones, two primary mineralized zones located approximately two kilometers apart.
With the Class 3 approval in hand, the Company intends to plan and advance exploration programs across the Blende Project over the coming seasons, subject to the conditions of the approval and applicable regulatory requirements. Blende Silver Corp. is a Vancouver-based junior resource company focused on silver-zinc-lead exploration and development at its flagship Blende Project in north-central Yukon. The property covers 5,345 hectares, is winter road accessible, and is located approximately 63 km northeast of Keno Hill, Yukon. The Blende property lies within the Keno Hill silver district, one of Canada’s highest-grade historic silver producing districts, currently being advanced by Hecla Mining Company. The property has undergone more than $9.2 million in past exploration, including 25,195 meters of drilling in 132 drill holes.


